Thursday, October 31, 2019
Painting A Speaker
Also like to see work with Graphene infused with HDPE for creating the SuperTransportation of the Future. We need to get off burning oil for energy. We will use Graphene for our future energy requirements. Yet oil is a big player. So we need to keep the oil as the new building blocks and keep oil as a solid and mixed with Graphene to create GHDPE. Once we have this we can make 3D Printed Filaments :) Then we get making tunnels like AGRU. I'm seeing if they will build their next plant in NL. Next to our Graphite deposit ;) https://www.agru.at/en/applications/agruline/grand-opening-ready-for-the-next-level/
Sunday, October 27, 2019
Improved Magnesium Air Battery With Graphene Ink
Hmm not only do I have a Graphite Deposit in my back yard. Maybe North America's Largest. I have Talc deposits in my front yard for getting magnesium :) https://www.nr.gov.nl.ca/mines&en/geosurvey/education/minerals/industrial/
Then there is Bett's Cove. https://www.nr.gov.nl.ca/nr/mines/prospector/matty_mitchell/pdf/Industrial-Minerals/Betts%20Cove%20Soapstone.pdf
Just down from Tilt Cove, where we will have a Gold/Copper recovery of 3-6 million tons of tailings to run. Getting 0.2 - 1.3 g/t of gold and 1-2% copper https://www.nr.gov.nl.ca/nr/mines/investments/copper.pdf
With the Gold I get from my recovery project, I can create many mines for this tech and Power the World! Woo Hoo :)
24 deposits here https://gis.geosurv.gov.nl.ca/mods/Display.asp
Latest happening at Tilt Cove
https://www.anacondamining.com/tilt-cove-project
http://www.metalscreek.com/article/tilt-cove--nfld-124.asp
We now have to get bulk samples for https://reclamin.ca/ They are just this week setting up operations to start running the tailing from the 3 to 6 current and past gold and copper mines operations. It has to be $B's in the 10-20MMT of tailings.
https://www.nr.gov.nl.ca/nr/mines/investments/gold.pdf
I do not have a PFD of Graphite for NL. But I know we have LOTS and I hope soon North America's Largest Graphite mines and Graphene processing and manufacturing Deepwater Port Facility.
It's the Vision, It has been the plan. it has been working. I'm acquiring the means to Create! Now I take Action, to Create. :)
Who wants in? We have a LOT to do. Partners, supporters, suppliers, consumers, Investors? The more we have, the future and faster we move in transiting off oil and onto Graphene :)
Subscribe to:
Posts (Atom)